Parrish Medical Center Phases II-III
Titusville, Florida
The scope of work included exterior structural metal stud framing, soffits, sheathing and installation of brick ties with a complete stucco and plaster system. The interiors included a complete drywall package consisteing of interior framing, unloading, storing, and inventorying and the installation of hollow metal frames, hanging wall board fire code and lead lines, and providing all levels of drywall finish. Additionally, we provided fire stopping and stenciling of tops of walls and installed GFRG column covers. The project required extreme attention to detail in order to meet AHCA standards and code requirements.
|